No minimum order · Sample room first · Phased by building or floor · Factory-assembled casegoods for Australia

Motel room furniture for Australian refurbishments

Custom room furniture and joinery from Foshan for Australian motel refurbishments.

Last updated:

Reviewed by Bo, Project Manager at NOVARTE

Replace room furniture and joinery to one approved sample: wardrobes and luggage benches, desks, headboards, bedside tables and vanities. Match production and shipment phases to the rooms your site team can close at a time.

Start with what you have

What happens after you send?

  1. Share your starting point. Tell us your project type and destination. Drawings are welcome, but you can begin without them.
  2. We review the scope. Our Foshan team checks the items and destination arrangements, then identifies any missing details.
  3. We reply with the next step. We follow up using your contact details, with relevant questions and material or product options for your project.

We review each enquiry individually. If more information is needed, we’ll explain what to send.

What we need for a quote

Only one contact and what you need are required to start. Share these extra details when available:

  • Destination city and delivery location requirements
  • Room types, replacement items and approximate quantities
  • Rough dimensions, a plan, sketch or reference photos
  • Preferred materials and finishes, if already chosen
Send your project details

Real projects. A real workshop.

See the work behind your order.

We manufacture fitted cabinetry and coordinate furniture from Foshan. Drawings, selected materials, sample approval and shipment responsibilities are agreed for your project.

Watch our Foshan factory film
Machines and workbenches inside the Foshan cabinetry workshopInside our Foshan factory

Furniture & joinery together

Take a look inside a sample guestroom.

Real footage from a partner showroom in Foshan shows a guestroom arrangement with a bed, headboard, bedside furniture and fitted storage.

Use it to discuss the items, dimensions and finishes in your own hotel or motel brief. Your room layout, material schedule and local installation scope are agreed separately.

Partner showroom · Sample room for reference

Partner showroom · Guestroom sample
Guestroom bed and fitted storage in a partner showroom
Partner showroom · Guestroom bed and fitted storage
Twin-bed guestroom with desk and fitted storage in a partner showroom
Partner showroom · Twin-bed guestroom with desk and fitted storage

The short answer

A motel furniture refurbishment replaces the casegoods and joinery in each room to one approved sample room. Units are labelled by room number and can be produced and shipped in phases by building or floor. HospitalityHub’s 2025 guide puts soft refurbishments at about AUD 5,000–15,000 per room and the typical hotel refurbishment cycle at 7–10 years.

Las Vegas hotel project guestroom bed and upholstered bench beside the bathroom partitions
Las Vegas hotel project · guestroom furniture and partitions
Riyadh W Hotel guestroom and bathroom photographs with bedside furniture and fitted vanity
Riyadh W Hotel · guestroom and bathroom views

What’s in a room package

Soft or hard refurbishment?

ComparisonSoft refurbishmentHard refurbishment
Typical scopePaint, carpet, curtains, bedding, freestanding furniture and lightingAdds bathrooms, built-in joinery, flooring and some services
Indicative cost per roomAbout AUD 5,000–15,000About AUD 25,000–60,000+
Time per roomAs little as 3–5 days2–4 weeks, usually floor by floor
What we supplyFreestanding furniture and agreed simple joineryJoinery, vanities and furniture packages

HospitalityHub, updated 3 September 2025. Figures are indicative industry ranges, not our prices or our production and installation times.

Plan the phases around your rooms

Tell us how many rooms you can close at a time. We plan production and shipping in matching phases, label units by building and room number, and keep the approved sample as the reference for every phase. Your local site team confirms room closure and reopening dates.

Agree the materials and installation scope

For wall linings, your project specifier confirms the applicable BCA/NCC fire requirements. Agree any upholstery fire tests for its intended use; a wall-lining classification does not establish a chair’s fire performance.

A local measuring team and project-specific partners can support Australian orders. Site fixing, services, installer scope and fees are confirmed for your project.

Common questions

Is there a minimum number of rooms?

No. You can start with one sample room or a single motel refurbishment.

Can you match existing furniture?

Yes. Send dimensions, photographs and a finish sample so we can agree a matching sample before production.

Can installation be phased by building or floor?

Yes. We can stage production and shipment by building or floor, with your installer confirming the site sequence.

How long from sample approval to the first shipment?

Production typically takes 30–45 days after sample approval, plus sea freight and clearance. Materials, quantities and the phased programme determine the agreed dates.

Sources

Sources checked 26 October 2026.

Start with what you have

Your idea.
Our next conversation.

Tell us what you need and where it will be delivered. A photo, a rough floor plan or a short product list is enough to begin.

Send drawings on WhatsApp Have files? Send a detailed brief